June 2002
May 2002 June 2002 July 2002 August 2002 September 2002 October 2002

 

June 8, 2002 - Work continues.

June 24, 2002 - Priming again.  
We thin the primer with a marine-grade product called Penetrol.  Before the thinned coat dries we follow up with a full strength coat to provide the best penetration into the wood with a strong, heavy coat on the outside.  

June 25, 2002 - A slightly different view from the southwest corner of the property.

June 24, 2002 - The scaffolding is going up on the east side of the house.

 

June 30, 2002 - Just about finished with the top floor.   We're waiting on the new storm windows and porch posts which should arrive in about two weeks.  The porch floor and ceiling still need to be replaced, as well as the balusters and railing.